RESULTS

DRILLING RESULTS

2018

Drilling for Ocean Resources (Riserless Drilling)
Plug and Abandon for 2nd Offshore Production Test of Methane Hydrate(offshore Atsumi Peninsula to Shima Peninsula)

Duration:Mar. – Jun. 2018
Operator : Japan Methane Hydrate Operating Co., Ltd.
We carried out as a part of the research and development business of METI.

2017

Off Erimo Peninsula(Riserless Drilling / Coring Operattion)Expedition 910 SCORE ERIMO-1

Duration:Sep. 2017
Water Depth : 1,069m, Drilling Depth : 142m(3 holes)

Drilling for Ocean Resources
2nd Offshore Production Test of Methane Hydrate(offshore Atsumi Peninsula to Shima Peninsula)

Duration:Apr. – Jul. 2017
Operator : Japan Methane Hydrate Operating Co., Ltd.
We carried out as a part of the research and development business of METI.

2016

Okinawa-Trough(Riserless Drilling / Coring Operation / Installment of Core Sampling System )Strategic Innovation Program (SIP)-III Expedition 909

Duration:Nov. – Dec. 2016
Water Depth : 1,580.5 - 1926m, Drilling Depth : 25 – 110m(10 holes)

Off-Kochi(Riserless Drilling / Coring Operation / Installment of Long-term Observatory Assembly)IODP Expedition 370, T-Limit

Duration:Sept. – Nov. 2016
Water Depth : 4,775.5m, Drilling Depth : 1,180m

Drilling for Ocean Resources (Riserless Drilling)
Drilling for 2nd Offshore Production Test of Methane Hydrate (Pre-Drilling, offshore Atsumi Peninsula to Shima Peninsula)

Duration:May – Jun. 2016
Operator : Japan Methane Hydrate Operating Co., Ltd.
We carried out as a part of the research and development business of METI.

Okinawa-Trough(Riserless Drilling / Coring Operation / Installment of Core Sampling System)Strategic Innovation Program(SIP)-II Expedition 908

Duration:Feb. – Mar. 2016
Water Depth : 1,020.5 – 1,602m, Drilling Depth : 1.5 – 238m(11 holes)

2015

Drilling for Ocean Resources
Methane Hydrate Boring Survey in the Bay of Bengal, India(Riserless Drilling / Coring Operation)

Duration:Feb. – Aug. 2015
Operator : ONGC
Water Depth : 1,550 – 2,800m, Drilling Depth : 200 – 500m(41 holes)

2014

Okinawa-Trough(Riserless Drilling / Coring Operation)Strategic Innovation Program (SIP)-I Expedition 907

Duration:Jul. 2014
Water Depth : 915 – 1,160.5m, Drilling Depth : 126 – 341.5m(10 holes)

Non-IODP
Seabed Boring Survey, offshore Shimokita Peninsula Operation, Japan(Riserless Drilling/Coring Operation)

Duration:April – May 2014
Operator:Japan Nuclear Fuel Ltd.
Water Depth: Approx. 100m to 600m Drilling Depth:Approx. 50m to 700m

2013

“Nankai Trough Seismogenic Zone Experiment Drilling” Stage 3Integrated Ocean Drilling Program (IODP Expedition 348)

Duration:September 2013‐January 2014
Water Depth:1,939m Drilling Depth:5,025m Riser Drilling
Water Depth:1,937.5m Drilling Depth:2,478.5m Riserless Drilling
Total Length of Retrieved Core:31.40 m(Riser Drilling), 16.44m(Riserless Drilling)

Drilling for Ocean Resources/Non-IODP
1st Offshore Methane Hydrate Production Test (Research and Plug & Abandon of Monitoring Well),
Offshore Atsumi Peninsula to Shima Peninsula, Japan

Duration:July-August 2013
Operator:Japan Petroleum Exploration Co., Ltd.
We carried out as a part of the research and development business of METI.
Water Depth:998.7m Drilling Depth:1,420m (Riserless Drilling)

Drilling for Ocean Resources/Non-IODP
Exploratory Drilling at "Joetsu Kaikyu"

Duration:April-July 2013
Operator:JX Nippon Oil & Gas Exploration Corporation
Water Depth:1,140m Drilling Depth:3,110m Riser Drilling

Drilling for Ocean Resources/Non-IODP
1st Offshore Methane Hydrate Production Test(offshore Atsumi Peninsula to Shima Peninsula)

Duration:January - April 2013
Operator:Japan Petroleum Exploration Co., Ltd.
We carried out as a part of the research and development business of METI.
Water Depth 998.7m Drilling Depth 1,345m Riser DrillingView Record

2012

Nankai Trough Seismogenic Zone Experiment Drilling Stage 3Integrated Ocean Drilling Program (IODP Expedition 338)

Duration:September 2012‐January 2013
Water Depth 1,939m Drilling Depth 3,974m Riser Drilling
Water Depth 1,900m~3,000m Drilling Depth 3,000m~4,300m Riserless Drilling
Total Length of Retrieved Core:675.93m

Deep Coalbed Biosphere off ShimokitaIntegrated Ocean Drilling Program (IODP Expedition 337)

Duration:July-September 2012
Water Depth 1,180m Drilling Depth 3,674.5m Riser Drilling
Total Length of Retrieved Core:200.88m

Japan Trench Fast Drilling ProjectIntegrated Ocean Drilling Program (IODP Expedition 343)

Duration:July 2012
Water Depth 6,897.5m Drilling Depth 7,780m Riserless Drilling(Installation of the long-term observatory assembly)

Drilling for Ocean Resources/Non-IODP
1st Offshore Methane Hydrate Production Test(offshore Atsumi Peninsula to Shima Peninsula)

Duration:June-July 2012
Operator:Japan Petroleum Exploration Co., Ltd.
We carried out as a part of the research and development business of METI.
Water Depth 998.9m Drilling Depth 1,347m Riserless Drilling
Total Length of Retrieved Core:32.99m

Non-IODP
Kumano Mud-Volcano Drilling II

Duration:June 2012
Water Depth 1,900.2m Drilling Depth 2,132m Riserless Drilling
ater Depth 1,900.2m Drilling Depth 1,940m Riserless Drilling
Total Length of Retrieved Core:46.50m

Japan Trench Fast Drilling ProjectIntegrated Ocean Drilling Program (IODP Expedition 343)

Duration:April-May 2012
Water Depth 6,883.5m Drilling Depth 7,768.5m Riserless Drilling(Logging While Drilling)
Water Depth 6,918m Drilling Depth 7,762.5m Riserless Drilling (Coring)
Total Length of Retrieved Core:53.13m
View Record

Drilling for Ocean Resources/Non-IODP1st Offshore Production Test of Methane Hydrate Pre-Drilling (offshore Atsumi Peninsula to Shima Peninsula)

Duration:February-March 2012
We carried out as a part of the research and development business of METI.
Water Depth 1,000m Drilling Depth 1,400m Riserless Drilling
Water Depth 1,000m Drilling Depth 1,240m Riserless Drilling
Water Depth 1,000m Drilling Depth 1,350m Riserless Drilling

2011

Drilling for Ocean Resources/Non-IODPOil and Gas Drilling Operation at Manner Basin, Sri Lanka

Duration:August-December 2011
Operator: Cairn Lanka Pvt. Ltd.
Water Depth 1,350m Drilling Depth 3,300m Riser Drilling
Water Depth 1,500m Drilling Depth 4,740m Riser Drilling
Water Depth 1,340m Drilling Depth 3,600m Riser Drilling

Offshore Aichi PrefectureSeabed Boring Survey for Methane Hydrate Resources (offshore Atsumi Peninsula to Shima Peninsula)

Duration:February 2011
We carried out as a part of the research and development business of METI.
Water Depth 1,400m Drilling Depth 1,530m
Water Depth 1,000m Drilling Depth 1,300m
Water Depth 1,000m Drilling Depth 1,250m
Water Depth 1,000m Drilling Depth 1,120m
*4 sites(Water Depth:About 1,000m~1,400m)
Total Length of Retrieved Core:370m

The Great East Japan Earthquake

Mar. 11th, 2011
On facing of the earthquake, "CHIKYU" was anchored in Hachinohe, Aomori Prefecture, and left the shore to avoid a tsunami in emergency with 48 elementary school students on-board who were on a tour of the ship at the time, immediately after the warning was issued,
At the noon of next day, the elementary school students disembarked by a helicopter of Maritime Self-Defense Force, and everyone including all of crew returned safely.

2010

Kumano-nada, offshore Kii-PeninsulaIntegrated Ocean Drilling Program (IODP Expedition 332・333)

Duration:October 2010 ~ January 2011
Expedition 332
Water Depth 1,960m Drilling Depth about 2,940m
Riserless Drilling: Installment of Long-term Observatory Assembly
Water Depth 2,520m
Riserless Drilling:Retrieval of Temporary Observatory Assembly

Expedition 333(Coring)
Water Depth about 3,080m Existing Well
Water Depth about 4,050m Drilling Depth about 4,450m
Water Depth about 3,510m Drilling Depth about 4,100m
3 sites/8 holes Water Depth about 3,000m~4,000m)
Total Length of Retrieved Core:930m

Okinawa TroughIntegrated Ocean Drilling Program (IODP Expedition 331)

Duration:Sep. 2010
Drilled and Cored at 5 sites(Water Depth about 1000m).
Total Length of Retrieved Core:305 m.

Kumano-nada, Offshore Kii PeninsulaIntegrated Ocean Drilling Program (IODP Expedition 326)

Duration:Jul. 2010~Aug. 2010
Water Depth about 1,930m Drilling Depth about 870 m Riserless Drilling.

2009

Offshore Boso Peninsula

Duration:Nov. 2009~Dec. 2009
Drilled and cored at 2 sites/7 holes(Water Depth about 2,050m).
Total Length of Retrieved Core:910 m.

Kumano-nada, Offshore Kii PeninsulaIntegrated Ocean Drilling Program (IODP Expedition 319, 322)

Duration:May. 2009 - Oct. 2009
Cored and Drilled at 4 sites/5 holes drilled at 84 sites.
Deepest drill depths of each site shown below.
Water Depth about 2,060 m Drilling Depth about 1,600 m Riser Drilling
Water Depth about 2,530 m Drilling Depth about 560 m  Riserless Drilling
Water Depth about 4,060 m Drilling Depth about 950 m  Riserless Drilling
Water Depth about 3,610 m Drilling Depth about 570 m Riserless Drilling

Offshore Suruga Bay

Duration:Mar. 2009
Drilled and cored at 4 sites(Water Depth about 650 m - 800 m).
Total Length of Retrieved Core:182.33 m.

Kumano-nada, Offshore Kii Peninsula

Duration:Mar. 2009
Drilled and cored at 3 sites(Water Depth about 1,910 m - 2,080 m).
Total Length of Retrieved Core:102.1 m.